The installation of the evaporation-condensation system (at laboratory scale), designed in the framework of the LIFE LEACHLESS project,  has been completed.

Now this facility will treat the leachate to obtain a clean condensate that will feed the forward osmosis plant.

The first tests are allowing to adjust the operating parameters of the system.

Share This